行业比较.jpg

Compared with other flooring materials, the following table illustrates the signifiCant advantages of ChemTec ONE in terms of Product itself, construction, operation and maintenance, and economy:

Comparison Table of Various Industrial Floors

Product projectEpoxy resinWear resistant flooringTerrazzoPVC flooringChemTec ONE
Yield
product
Nature
can
Finger
Mark

Due prevention effect

Due to free

Reduce cost

Reduce cost

Due to free

Due to free

Wear resistance

Two point three

Four point six

Three points three

Two points one

Above 6.3

Mohs hardness

2-3

6-7

4

Two point eight

Above 8

Impermeability (/M) ²)

0 mills per hour

200 mills per hour

250 mills per hour

0 mills per hour

0.076 mills per hour

Anti aging

3-5 years

5-8 years

5-8 years

2-3 years

Over 60 years

Warranty period

1 year

1-year, 2-year warranty

2 years

1 year

At least 20 years

Unit price (M ²)

RMB 35-180

12-40

28-75

60-160

50-160 (colorless, colored)

Shi
Work
Special
Spot

Construction methods

Multi layer multiple coating

Springing and machine grinding

Water mill

Post

Spray painting, simple and conservative

Duration

After 21 days of drying, the newly made floor will be approximately

500M ²

Simultaneously with concrete pooling, approximately every day

1000M ²

The construction period is too long, about every day

300M ²

After the new floor needs to be dry, it is recommended to wait for approximation

500M ²

Simultaneously with concrete pooling, approximately every day

2000M ²,Shorten the construction period

Maintenance period

7 days

14 days

3 days (waiting)

3 days

After construction is completed, people can enter within 2 hours and can carry loads within 7 days

Safety and environmental friendliness

Slightly toxic and irritant, construction requires fire prevention and is not environmentally friendly

Must be high, construction personnel need to take Protective measures

Too many construction poles, not environmentally friendly friends

Adaptive is volatile and requires fire protection

Complies with all VOC regulations, non-toxic, non flammable, and environmentally friendly

Basic Requirements

To make a waterproof layer, otherwise it is easy to peel off the shell

Can only be used on new ground, old ground cannot be used

No requirements

To make a waterproof layer, otherwise it is easy to peel off the shell

Both new and old floors are available, with no waterproof requirements

Transport

Dimension
protect

Cleaning

Oil stays and black scratches, diffusion to clean

Oil stays are easy to pentrate and diffuse to clean

Oil stays are easy to pentrate and diffuse to clean

Easy to leave black scratches, diffusion to wash off

No oil leakage, easy to clean

Maintenance and upkeep costs

No need for waiting

Waiting is required every time
0.5 yuan/M ²

Waiting is required every time
0.5 yuan/M ²

No need for waiting

No need for washing, only water is needed
Or occasionally moving the floor with soap water

Vulnerability level

Easy to peer off, easy to leave black scratches, getting older and older

There is peering phenomenon, which is troublesome to repair and prone to leaving black scratches

The more cost is used, the more sustainable it is to damage at the partition strip

Easy to peer off and wear out

Difficult to wear and tear, does not peel, and the longer the use time, the brighter it will be

Replacement costs

2-3 years (Cheep materials)
1-2 years of repainting
Once

Reconstruct every 3-5 years

Replacement around 10 years

2-3 years replacement

Semi permanent, with the same period as the building


Wechat

Tiktok