![图片关键词 图片关键词](../upload/202403/1709609078377717.jpg)
Within the Jiangbei New Area of Nanjing City, Jiangsu Province.The entire bridge is 520 meters long, with a main span of 220 meters. It uses a suspended basket cantilever continuous beam to cross existing shipping channels and roads. The beam is located on a curve, and the main tower is a reinforced concrete H-shaped inclined tower column structure.
![图片关键词 图片关键词](../upload/202403/1709616165710152.jpg)
Due to factors such as design defects, concrete construction quality, and overloading, bridge structural diseases occurred and rapidly developed. In 2016, it was identified as a dangerous bridge and underwent reinforcement and renovation.
The main measures for bridge reinforcement and renovation include: sealing cracks, anti-corrosion treatment of concrete surfaces, etc. In the durability and anti-corrosion treatment of concrete, ChemTec concrete sealing and curing agent is used for protection. ChemTec concrete sealing and curing agent is an active silicate permeable crystalline material that provides permanent protection for the durability of concrete.
![图片关键词 图片关键词](../upload/202403/1709616433942627.jpg)
Kentech protective agent products
![图片关键词 图片关键词](../upload/202403/1709616551217907.jpg)
High pressure flushing of bridge deck
![图片关键词 图片关键词](../upload/202403/1709616693200654.jpg)
High pressure flushing of bridge piers
![图片关键词 图片关键词](../upload/202403/1709616790246125.jpg)
Using Kentech protective agent products
![图片关键词 图片关键词](../upload/202403/1709616945267548.jpg)
Bridge deck roll coating with Kentucky protective agent
![图片关键词 图片关键词](../upload/202403/1709617108542303.jpg)
pierRoll coating Kentek protective agent